EADO AGRI-TECH · GREENHOUSE SYSTEMS · HEBEI, CHINA · SINCE 1999 ISO 9001:2015 · SGS TESTED · 100+ PATENTS
EADOAGRI-TECH Request a proposal
HomeServicesInstallation and commissioning
STAGE 04

Installation and commissioning

Either our crews build it or we supervise yours. Both routes end with the same geometry check and the same performance test.

What the stage covers

  • Erection plan, foundation interface and alignment control
  • Installation of covering, ventilation, irrigation, heating, cooling and electrical
  • Commissioning and performance testing before handover
  • As-built documentation and maintenance schedule

What you receive

  • Installation records and alignment report
  • Commissioning report with set points and alarm list
  • As-built drawings
  • Operator handover pack
Next step

Start where you are

Send what you already have — land, drawings, a design, or just a crop and a country. We will tell you which stage you are actually at.

Request a proposal Build a brief
Your project brief · 0 items Open brief Send to Eado