STAGE 04
Installation and commissioning
Either our crews build it or we supervise yours. Both routes end with the same geometry check and the same performance test.
What the stage covers
- Erection plan, foundation interface and alignment control
- Installation of covering, ventilation, irrigation, heating, cooling and electrical
- Commissioning and performance testing before handover
- As-built documentation and maintenance schedule
What you receive
- Installation records and alignment report
- Commissioning report with set points and alarm list
- As-built drawings
- Operator handover pack